The annual schedule can be ON or OFF and can be enabled or disabled from the Configuration/1 Page:

When the calendar is active, it contributes, together with other factors (see ​

https://setecna.atlassian.net/wiki/spaces/PUBDOCS/pages/3258778099
), to the activation of the system and the determination of Current Season.

Note

The menu is only visible if the Annual Schedule function has been activated by ticking Schedule Enable.

Each entry allows you to specify the system working mode starting from a specific date; for each entry you must set:

  • The start date of the period: starting from the specified date, the next 2 parameters are activated, until the next date is reached.

  • Heating/Cooling system status: it can take on the following values:

  • Domestic Hot Water production status; it can take on the following values:

    • OFF, the DHW production is OFF

    • ON, the DHW production is ON

Warning

DHW also has its own external signal enable command (see ​

)

Note

The mode set on a certain date is maintained until the next date, chronologically, in the schedule. If the system is not online and therefore DOES NOT receive a date and time from the server, this must be set manually in ​

.