During commissioning, it may be convenient to check that the connections of analogue and digital outputs are connected as shown in the scheme. But it is known that very often probes are missing, dry contacts are missing, and therefore the system cannot actually be started.

Therefore, “blank” tests are carried out by forcing the outputs and bypassing the logics.

The Zones, Circuits, Dehumidifiers, Sources and DHW pages have the possibility of manually forcing the outputs. However, it is not possible to force the Solar/Electric and Opentherm page.

Within the Circuits, Dehumidifiers and Sources pages there is a section called Manual Override:

PHOTO TBD

PHOTO TBD

PHOTO TBD

While the Zones page in the Configuration Zone/1 subpage has a Force column that can activate the Zone output:

PHOTO TBD

Warning

Not to be confused with the zone Working Mode Forcing, which is explained in ZONE ACTIVATION AND WORK MODE.

The DHW Page also has an Output Forcing line, which is different from the DHW Subsystem Working Mode Forcing:

PHOTO TBD

Attenzione

Una volta terminate le prove e verificato che i collegamenti elettrici siano fatti come da schema, ricordarsi di cliccare Rimuovi Forzature, di modo che tutte le uscite tornino in Automatico!

PHOTO TBD

Dimenticare le forzature manuali inserite può provocare CONSEGUENZE CATASTROFICHE!!!